2X660 MW Jaypee Nigrie Super Thermal Power Plant
Jaypee Nigrie Super Thermal Power Project comprising 2 x 660 MW Super-critical Unit will be set up by Jaiprakash Power Ventures Limited, a subsidiary of JAL at a site in Nigrie - Village, Tehsil - Deosar, District - Singrauli in Madhya Pradesh. The expected date of commissioning for Unit - I and Unit - II are end April 2013 and end October 2013 respectively.
Amelia (North) and Dongri Tal – II coal block with total coal reserves of 250 MT of coal. These coal blocks contain sufficient coal reserves to fuel the Nigrie Thermal project over the long term. JAL is expected to develop and mine this coal in a joint venture with MPSMCL. The joint venture has been allotted these two coal blocks solely for the purpose of supplying fuel to the Nigrie Thermal Project.
The Nigrie Thermal Project is expected to utilize coal from two captive coal blocks, the Recently, Group has entered into an agreement with L&T-MHI Pvt. Ltd. (JV between L&T Ltd. And Mitsubishi heavy Industries Limited, Japan) for supply of super-critical, environmental friendly, more energy efficient Boiler, Turbines and Generator (BTG) packages for their Nigrie project.
Environmental Clearance from MoEF for Nigrie Project [Download]
1500 MW Bina Thermal Power Project
The Group is also setting up a 1500 MW coal fired Thermal Power Plant at Bina in the State of Madhya Pradesh. The project is expected to be commissioned by 2011 (phase -1).
1980 MW Karchana & 3300 MW Bara Thermal Power Project
JAL has been awarded LOIs for 1980 MW (3 x 660 MW) Karchana Thermal Power Project and 3300 MW (5 x 660 MW) Bara Thermal Power project in UP. These projects are expected to be commissioned by 2014.
|